High Bay Warehouse
The Challenge
Solution
After working in attendance with the piling contractor, we commenced with the reduce dig excavation and the breaking and trimming down of 950 concrete piles. The preparation of the new slab then continued which included a water proofing membrane and the installation of 115 tonnes of steel.
During the rebar installation, our engineers set out the works to ensure that there would be no clashes between the rebar and the 670 bolts to be later installed for the high bay racking system.
Outcome
Timeframe2019
ClientsAstraZeneca
LocationUnited Kingdom
Budget$2.2m